深圳至中山通道为世界级超大的“桥、岛、隧、地下互通”集群工程。中交二公局承建桥梁工程S06标,路线全长7504米,主要包括中山大桥、引桥、非通航孔桥、万顷沙互通等。中山大桥为主跨径580米的斜拉桥。
Shenzhen-Zhongshan Bridge is a world-class cluster of "bridge, island,
tunnel and underground interchange". CCCC Second Highway Engineering has
contracted to build section S06 of the Bridge Project with a total length of
7504m, which mainly includes Zhongshan Bridge, the approach bridge,
non-navigable opening bridge, Wanqingsha Interchange and so on. Zhongshan
Bridge is a cable-stayed bridge with a main span of 580m.
地址:西安市科技六路33号 邮编:(710065) 电话:+86-029-89560113 电子邮箱:zjegj@shbcccc.com
Copyright©2012中交第二公路工程局有限公司 版权所有All Rights Reserved
网站维护:科技与数字化部
陕ICP备08105335号