最新消息

哈尔滨地铁3号线项目

发布时间:2018-11-09 09:02:11 来源: 分享到:

中交二公局承建哈尔滨地铁3号线一期4站4区间的机电工程、二期安通街出入段线区间的土建工程,并承担部分铺轨施工任务。施工中解决了盾构穿越棚户区、铁路框架桥、小曲线半径、大坡度掘进等难题。

CCCC Second Highway Engineering Co., Ltd. has contracted the mechanical and electrical engineering of Phase I of Harbin Metro Line No.3 with four-station four-section and the civil engineering of Antong Street Entrance and Exit Section in Phase 2, and undertaken part of the construction task of laying tracks. During the construction, the problems of shield tunneling through shanty towns, railway frame bridges, small curve radius, large slope tunneling and so on were solved. 

地址:西安市科技六路33号 邮编:(710065) 电话:+86-029-89560113 电子邮箱:zjegj@shbcccc.com
Copyright©2012中交第二公路工程局有限公司 版权所有All Rights Reserved
网站维护:科技与数字化部  陕ICP备08105335号

  • 手机版网站
  • 微信公众号