中交二公局承建青岛轨道交通13号线一、二期正线140公里(单线)及一个车辆段和2个停车场的铺轨任务、二期工程古镇口车站—古镇口南车站段落下部结构及车站土建施工。项目铺轨工程荣获山东省市政工程安全文明工地称号。
CCCC Second Highway Engineering Co., Ltd., is responsible for the
construction of 140 km (single line) of Qingdao Rail Transit Line 13 Phase 1
and Phase 2, track laying for 2 parking lots, construction of the substructure
and subsection construction of Guzhenkou Station-South Guzhenkou Station in
Phase 2. The track-laying project won the title of safe and civilized
construction site of Shandong municipal engineering.