中交二公局施工的克里比疏港高速公路项目由中国进出口银行和喀麦隆政府共同出资,全部采用中国高速公路规范进行设计、施工,其主线全长38.5公里,是克里比深水港货物向喀麦隆北部及东部运输的重要通道,也是克里比地区最主要的交通运输走廊。
The construction of the Kribi-Lolabe Highway Project of CCCC Second
Highway Engineering Co., Ltd. was jointly financed by the Export-Import Bank of
China and the Cameroonian government. The main line is 38.5km long and is an
important channel for the transport of goods from the Kribi-Lolabe to the
northern and eastern parts of Cameroon, which is also the main transport
corridor in Kribi.