中交二公局负责刚果(布)布拉柴维尔滨河大道改扩建项目2646米施工任务,包括新建斜拉桥和滨河大道扩宽段,其中斜拉桥主跨径285米,是世界最大的小半径曲线斜拉桥。相关研究成果填补了国内外曲线斜拉桥设计施工领域的空白。
CCCC Second Highway Engineering Co., Ltd. is responsible for the 2646m
reconstruction and expansion project of the Congo-Brazzaville Riverside Avenue,
including the construction of the cable-stayed bridge and the extension section
of Riverside Avenue. The main span of the cable-stayed bridge is 285m, making
it the world's largest curved cable-stayed bridge with a small radius. The
related research results fill the blank in the field of design and construction
of curved cable-stayed bridges at home and abroad.